Plans and permissions:
- Add-on: BPO management, billed separately
- Change the time zone and check the connection: Admin or Manager role, or a custom role with BPO management set to Can manage BPOs and allocations on the Data & integrations tab
- A custom role also needs the Admin or Manager base role to open BPO pages.
Use the Aspect schedule integration to sync a BPO’s Aspect schedules into Assembled automatically. Assembled reads Aspect’s Employee Daily Tally report, which your BPO exports with Aspect’s AutoRun and uploads to the integration’s SFTP server.
To manage it, go to Configure > BPO schedule integrations.
First, create the integration as described in BPO schedule integrations, and choose Aspect as the platform.
How the Aspect integration works
- The file is based on the Employee Daily Tally report, with the columns in the Aspect template CSV:
emp_id,start_time,stop_time, andstate_code. It’s fine for the file to have extra columns. - Aspect’s report doesn’t include a time zone, so when you connect the integration, choose the Timezone of Aspect export: the time zone your Aspect events are scheduled in.
- Each row’s employee ID is matched to the team member’s Aspect ID under Optional IDs on their profile.
- Each row’s state code is turned into an Assembled event type by your event mapping rules.
Configure AutoRun in Aspect
Your BPO sets up the export in Aspect. Use these settings when you create the AutoRun for the Employee Daily Tally report:
- For the report format, choose Comma Separated File with Column Headers.
- In Print Options for AutoRun, on the General tab, select Export Report Data and Show Employee ID.
- On the AutoRun tab, select Override AutoRun queue’s regional settings.
- Choose English (US), so dates and times are in the format Assembled expects.
- Schedule the AutoRun to upload the file to the SFTP server at regular intervals.
Check the connection
After the first file is uploaded, check the site’s Schedule auto-sync status on Configure > BPO schedule integrations. Schedule is up to date means the file synced. If rows didn’t sync, see Sync history.
Change the time zone
- On Configure > BPO schedule integrations, select Manage on the site’s card.
- Select the Platform connection tab.
- Under Timezone of the events in Aspect’s Daily Tally report, select Edit.
- Choose the time zone your Aspect events are scheduled in.
- Select Save.
The tab shows the new time zone.