Plans and permissions:
- Set up scheduling rules and working hours: Admin role, or a custom role with Scheduling rules set to Full access on the Configure tab
- Configure schedule generation and generate schedules: Admin, Manager, or Team Lead role, or a custom role with Edit schedules set to Can edit all agents’ schedules
- To use schedule generation, a custom role must also be able to edit every event type.
- If Schedule generation isn’t available to a Manager or Team Lead, their role needs Manage optimizations set to Can manage optimizations, on the Configure tab.
- If your access is limited to certain sites, you can’t open Schedule generation.
Use schedule generation to build your team’s schedules ahead of time without placing every event by hand. Assembled fills each person’s working hours with productive work, breaks, meals, and other events, following your scheduling rules and covering your forecast as well as it can. Results are saved to a test schedule, so you can review, edit, and regenerate them before you publish.
To open it, go to Schedule > Schedule generation.
Note: To turn on schedule generation for your company, contact our team.
How schedule generation works
Schedule generation uses:
- Your scheduling rules: working hours, event rules, shift rules, and productive work rules.
- Your forecast: the required staffing for each channel and queue.
- Your existing schedule: time off, recurring events, and events placed by hand.
- Each person’s attributes: the channels, queues, and skills they can work.
When it places events, it follows these principles:
- It changes as little as possible. It moves an event only if that meaningfully improves coverage.
- Manual events stay where they are. Generation replaces automated events but keeps time off, recurring events, Google Calendar events, and events someone created or edited by hand. If a manually placed event already meets a rule, generation doesn’t add another one, even if there’s a better time for it.
- Covered queues aren’t changed. If a queue’s net staffing is already positive, generation doesn’t try to improve it further.
- It looks at all channels and queues together. Generation balances coverage across every channel and queue, not the filtered view you see on the Staffing timeline.
- People only get work they’re eligible for. Productive work is assigned only for channels, queues, and skills a person can work.
- People with time off are scheduled last. Generation places events for people without time off first.
- Custom date range rules are used to place events. Event rules that repeat During custom date range are used when you build a schedule from the dashboard or the schedule assistant. They aren’t used to check your existing schedule.
Schedule generation and the schedule assistant
They’re two ways into the same tool, so there’s nothing to choose between. Both use the same steps and the same rules, and runs from both appear in History on the dashboard.
| Tool | Use it for | Date range | Where changes go |
|---|---|---|---|
| Schedule generation | Building the coming weeks on a test schedule, and tracking each week’s schedule status | Up to 31 days | The destination test schedule. Nothing reaches your team until you publish. |
| Schedule assistant | Targeted changes to the schedule you have open, such as adding breaks, fixing rule violations, or adjusting today | Up to 31 days | The schedule you have open |
When schedule generation works best
Schedule generation works best for larger teams, where placing events by hand takes a long time and staffing patterns are complex enough to benefit from optimization. It aims for the best coverage, not a specific output, so the more you need to control exactly who’s scheduled for what and when, the less it helps. It may suit you less if:
- Your team is small and schedules are mostly agreed in advance.
- You have many per-person requirements that can’t be expressed as shared rules.
- You need a precise result, such as exactly 5 people on Phone at 10:00 AM.
You can also combine the two: generate some event types and manage others by hand.
Set up schedule generation
Before you generate a schedule, set up the rules it uses.
- Create working hours for everyone who needs a schedule. Generation fills each person’s working hours with events, and doesn’t schedule anyone without them. See Working hours.
- Create event rules for breaks, meals, meetings, and any other events to include, and assign them to the people who need them. Productive work is included without a rule. See Scheduling rules.
- Create shift rules for your labor requirements, such as maximum shift length, rest between shifts, and consecutive working days.
- Optional: create productive work rules if you need control over which work types people are scheduled for.
- Configure the dashboard. See Configure schedule generation.
Tips for event rules
- Create a rule for every non-productive event you need. If there’s no rule for an event type, generation doesn’t add it.
- Assign everyone who needs the event. If someone isn’t assigned to an event rule, generation doesn’t schedule that event for them.
- Use fixed rules to limit the options. For example, if everyone in Site A must have a 30-minute meal in every shift, create a rule with that requirement, and everyone in Site A gets a 30-minute meal.
- Use flexible rules to give more options. For example, if people in Site B get a meal of 30 to 60 minutes, set that range in the rule. Generation then uses different meal lengths to maximize coverage.
Configure schedule generation
The first time you open Schedule generation, the Configure schedule generation dialog opens for you. To change the settings later:
- Go to Schedule > Schedule generation.
- Select the arrow next to Build schedule, then select Settings.
- In Configure schedule generation, set:
- Destination schedule: the test schedule that generated schedules are saved to. Your primary schedule isn’t available here.
- Time zone: the time zone used for the weekly cards on the dashboard and the dates you choose in Build schedule. The default is your company’s default time zone, or your own time zone if your company doesn’t have one.
- Select Save.
The dialog closes and you see Configuration saved.
To change your rules, select the arrow next to Build schedule, then select View scheduling rules.
Generate a schedule
- Go to Schedule > Schedule generation.
- Optional: to schedule part of your team, use the Channels and Queues filters, or select Add filter to filter by Site, Team, or Skill. The people who match your filters are already selected when you build a schedule.
- Select Build schedule at the top of the page. To start with a week’s dates, select Build schedule on that week’s card instead.
- Check the Date range, up to 31 days. Choose who to schedule under Who should we schedule?, and select Manage to add or remove people. Choose the events under Which events should we schedule?. Then select Continue.
- Choose whether to Improve it or Reset it for your test schedule.
- Under Who needs a new schedule?, choose all selected people, only the people who are already scheduled, or only the people who aren’t.
- Choose how to create shifts, then select Continue.
- Review the summary, then select Update schedule.
For what each option does, see Schedule assistant options.
Generation can take a few minutes, depending on the size of your team. You can leave the page while it runs. While it runs, it appears in History with the status Generating. When it finishes, you get an email. To stop a run, open its three-dot menu in History and select Cancel generation.
To review and publish the schedule:
- On the week’s card, open the three-dot menu and select Review pending schedule. The Staffing timeline opens on the destination schedule.
- Review the schedule and make any changes by hand. If something isn’t right, adjust your scheduling rules and build the schedule again.
- When you’re happy with it, select Publish schedule on the Staffing timeline. See Test schedules.
If the result isn’t what you expected, see Unexpected schedule generation results.
Track schedule status and history
The dashboard shows where your team’s schedules stand for the coming weeks, and every schedule generation run.
- Filters: Channels and Queues at the top, plus Site, Team, and Skill under Add filter. Filters apply to the weekly cards and History.
- Weekly cards: this week, labeled This week, and the next three weeks. Each card shows how many of the people in your filters have a published schedule, broken down into Published, In review (on the test schedule but not yet published), Not generated, and No shifts (no working hours and no events, so generation can’t schedule them). From a card’s three-dot menu, select Review pending schedule to open the test schedule, or View published schedule to see what your team sees now.
- History: every run from the dashboard and the schedule assistant, with its Target date range, Status, Destination, Agents, Event types, and Generated date. Select a target date range to see which people changed and how.
A run’s status is Generating, Applying, In review, Published, Failed, or Cancelled. From a run’s three-dot menu in History, you can select:
- View generated schedule to open it on the Staffing timeline.
- Regenerate to open Build schedule with the same dates and events.
- Cancel generation to stop a run that’s still going.
- Copy generation ID to share the run with our team.